LIGURIA
VILLA ALTACHIARA
STRUCTURAL CONSOLIDATION USING ROPES
The project was aimed at the structural consolidation of the external perimeter of the Villa, consisting of dry-stone masonry.
Operational Phases of the Intervention
1. Consolidation Intervention Using Rope Access
Using rope access and positioning techniques, controlled injections of structural mortar were carried out within the large fissures present between the stone blocks.
2. Saturation of Cavities and Connection of Stone Blocks
The injections were performed to partially saturate the internal cavities and restore the connection between the stone blocks, ensuring greater stability and cohesion of the masonry structure.